GOVENANT

Certification

The Registry

Every GOVENANT certificate names its level, its date, and cites its probe log. Two rules keep the registry honest: the verdict is the minimum of the load-bearing pillars (no averaging away a dead gate), and a claim that never survived a refutation attempt is not certified — it is asserted.

The reference implementation

The registry opens with the standard's own reference system — including its failures, because a registry that hides its steward's history would be performing exactly the disease this standard exists to catch.

Date System Verdict Finding
2026-07-02 iii agent-hub (reference) FLATLINED Architecture excellent; delivery zero. Nine event producers, two consumers; predictions hardcoded. The audit that named performed autonomy.
2026-07-07 iii agent-hub (reference) PERFORMED · L1 Real delivery had resumed — surrounded by performed governance: the ownership gate had fired once in system history; 0 of 321 "measured" decisions ever graded.
2026-07-13 iii agent-hub (reference) ALIVE · structural L2 The first documented revival: a persisted ALIVE verdict for one tenant of eight, traced end-to-end by ID with the ownership gate participating. Caveats attached: UNCOVERED (duty roster on day one); first graded outcomes due ~2026-07-27.

Claims here follow the standard's own discipline: nothing is stated that the substrate cannot back on query, and qualifiers drop only when the record earns it (The Covenant · claims discipline).

The next entry is unclaimed.

The instrument is proven — on us, three times, in public. The registry is open, and the first entry that isn't ours takes a place no one else can ever have. If your agent system is ready to be measured — or your vendor claims theirs is — claim it.

Get audited →